Submerged Arc Systems for Wind Farm Manufacturing
Red-D-Arc delivered three submerged arc systems to a construction company from Willebroek (Belgium) which has acquired a record contract for the construction of foundation structures to be used in an offshore wind farm close to the German-Dutch border. The Red-D-Arc manipulators are 23 ft x 23 ft and are equipped with a double wire system powered by the ESAB 1250 for welding 4 mm cored wire. In addition, each of the manipulators included a seam tracking system and flux recovery unit. Thanks to the advanced electronics and touch screen interface controls the turnkey systems each require only a single operator.