Tank Manufacturing Made Easy with Weld Automation Equipment

07 November, 17 10:41 am · Leave a comment · Taylor Stewart
Share
Facebooktwitterlinkedinmail

IMG_2087 medium

An oilfield equipment and vessel manufacturer in the United Arab Emirates approached Red-D-Arc for assistance with a large project. It was awarded to them at the last minute and was not their primary area of expertise. The requirement was to manufacture 25 large tanks with a timeframe of only one year. Each of the tanks was to be 5 meters in diameter by 25 meters long, manufactured using 16 millimeter thick material at a weight of approximately 45 tonnes.

The experienced Red-D-Arc Weld Automation team was able to immediately address all of the customer’s challenges. While other suppliers where insistent that the customer purchase the equipment, Red-D-Arc determined that long term rental would be their best option. This would avoid the time consuming process of acquiring CAPEX approval to purchase such a large amount of equipment and would further increase the profitability of the project. The manufacturer also had questions on how to avoid ovality and transverse movement of the sub-assemblies. Red-D-Arc experts were on-hand to provide the right advice and the right equipment to address these challenges.

The rental equipment included:
• 6x 10 tonne turning roll sets
• 10x 60 tonne drive rolls
• 47x 30 tonne and 60 tonne idler rolls
• 7x submerged arc packages with LT7 tractors and DC600 power sources

Red-D-Arc worked very closely with the company to ensure their success, providing comprehensive training and on-site assistance. After the successful completion of this project the company has become recognized in their market and are receiving new orders from similar customers in the industry. Furthermore, they anticipate being awarded “phase 2” of this project which is scheduled to begin in 2018.

Red-D-Arc Turnkey Packages Support the World’s Largest Offshore Wind Farm

23 October, 17 11:23 am · Leave a comment · Taylor Stewart
Share
Facebooktwitterlinkedinmail

Red-D-Arc recently supplied a variety of equipment to a UAE based company that is fabricating pile piping and jackets for the largest offshore wind farm project in the world. The company had to meet a strict time line of only 6 months, and would require a massive amount of welding and weld automation equipment immediately. Through consultation with Red-D-Arc, the customer determined that renting the majority of the equipment would be the most economical option. Red-D-Arc was able to fulfil the customers equipment needs immediately thanks to our vast and diverse fleet of equipment.

This massive order involved equipment and support from Red-D-Arc North America, Red-D-Arc UK and Red-D-Arc Middle East. The order consisted of a variety of welding and weld automation equipment including:
• 23 column and booms with single and tandem submerged arc welders
• 20 submerged arc tractors
• 200 rotators
• 167 jack-up rotators
• 400 CC/CV inverter welders
• 200 FCAW wirefeeders
• 10 Induction Heating Systems

By renting the majority of the equipment the fabrication company avoided the need to invest heavily in specialized equipment and ensured they would meet their deadline. Red-D-Arc works with customers to address their unique challenges and develops specialized solutions. Learn more about customized turnkey packages here.

AirGas Logo

Airgas, an Air Liquide company, is the nation's leading single-source supplier of gases, welding and safety products. Known locally nationwide, our distribution network serves more than one million customers of all sizes with a broad offering of top-quality products and unmatched expertise.